THE HOMEOWNER’S GUIDE TO SOLAR GETTING IT INSTALLED

Permits and inspections

Understand the separate roles of local permits, inspections and utility authorization.

← Back to the guide
Aerial view of a home with solar panels on a tile roofSolar installation example
On this page

Permits and inspections are part of the process for a safe, code-compliant solar installation. Your city or county generally handles building permits and inspections; the electric utility handles its own interconnection process. Confirm the specific requirements for your property with your installer and the relevant authorities.

The permit

Your installer typically prepares a plan showing the proposed equipment, layout and electrical work for the local permitting authority. Some California jurisdictions use automated systems for eligible projects; others have different procedures. The review, documentation and timing depend on the jurisdiction and project.

Before signing, check who will obtain the permits and whether permit fees are included. The California Contractors State License Board recommends specifying permit responsibilities in the contract.

Installer positioning a solar panel on a roof
A CLOSER LOOK Solar installation example

The inspection

After installation, the local jurisdiction generally inspects the work. If the inspector identifies an issue, the contractor may need to make a correction and arrange another inspection. Ask your installer how access and scheduling will work and request a copy of the final permit or inspection record.

Inspection is not the same as utility approval

A passed local inspection and permission from the utility serve different purposes. For a grid-connected system, follow your utility’s interconnection requirements and wait for its authorization before operating the system. SDG&E, for example, describes a final utility review and a permission-to-operate notice; other utilities may have different procedures.

Questions worth asking

  • Who submits the permit and utility applications?
  • What fees and related work are included in the contract?
  • Who schedules inspections and handles any corrections?
  • How will I receive the final permit and utility approval?

What happens at each step

Local approval and utility interconnection
StepWhat to expect
Plan and permitThe installer generally submits proposed layout, equipment and electrical information to the local authority. Requirements vary.
Plan reviewThe authority may approve the plan or request corrections before issuing the permit.
Installation and inspectionAfter installation, the authority generally inspects the work; identified items may need correction and reinspection.
Utility authorizationThe interconnection process is separate. Follow the utility's requirements and wait for its authorization before operating in parallel with the grid.

Some steps can happen in parallel and local rules differ. Ask who is responsible for each application, how you will receive updates, and what the utility still needs after inspection.

Sources and further reading

Next in Getting it installedInstallation day →