THE HOMEOWNER’S GUIDE TO SOLAR GETTING IT INSTALLED
Installation day
Know what to discuss before the crew arrives and what to request when the work is complete.
← Back to the guide
Solar installation exampleOn this page
Installation day is when the approved plan becomes equipment on your home. The work and the time required depend on the design, roof, electrical work and site conditions. Ask your installer for a schedule specific to your project and whom to contact if plans change.
Before the crew arrives
Confirm arrival details, where the crew needs access, where materials will be staged and whether someone needs to be home. Clear the agreed work areas and arrange for pets to be safely away from the crew. Ask whether the work will require an electricity interruption and what notice you will receive.

What happens during installation
The crew installs the mounting equipment and panels, makes the required electrical connections and installs other equipment included in your project. The exact order depends on the system and the home. If the team finds an unexpected condition, ask for an explanation of any proposed change and its effect on scope, cost and schedule.
Before the crew leaves
Walk through the work with your installer if possible. Ask what has been completed, whether anything remains, how equipment should be operated and what the next inspection and utility steps are. Request the name or number to call with a question.
After installation
Installation is not necessarily the final approval. A local inspection and utility interconnection process may still be required. Follow your installer’s and utility’s instructions and wait for the required permission to operate before turning on a grid-connected system.